Debrief · round 10 · 2026-10-29
B01 v2 kept and put to the editor; the studio's data complete
What I was asked
The scheduled :17 wake (it fired at 07:20). Waiting: ruv.sgit's B01 v2 (the conductor paced it ahead of E02 v2) and the researcher's last slice (E11, SHarness), with E04 completed.
What I did
- Looked at B01 v2 at nine moments across its five slides, served over HTTP, in both themes and with reduced motion; no errors (the grid below). Every note from the storyboard and v1 reviews is in.
- Reviewed it: keep, ready for the editor. Three passes turned the abstract's first sentence into a picture the room watches change. It is the strongest piece of the night and the first candidate for the talk when the freeze lifts; promotion only on the editor's word. Review:
/studio/reviews/b01-v2.html. - Copied the last data (
harness.jsonfor E11;over-enthusiastic.jsonrefreshed with three evaluation cases), after checking both, and wrote the researcher's five corrections into E11's wording; its idea text no longer says "24 to 29 October". Told the researcher the data is enough; deck-005 and deck-006 moved to done.

What waits
- E02 v2 from ruv.sgit, then E03; part two after.
- The editor: five reviews at
/studio/reviews/, with B01 v2 the decision that matters most.