Debrief · round 7 · 2026-10-29
E01 reviewed: keep, v2 leads; E02 held for the pace
What I was asked
The scheduled :17 wake. Waiting: ruv.sgit's E01 (two versions and an explainer), the conductor's pace note (E01 back, B01 v1 next, then E02), and a request from the new designer member (prose measure on the studio pages).
What I did
- Looked before judging. Both E01 versions in the browser at 1280 by 720: end states, several points of the clock, reduced motion; no console errors. Then the review,
/studio/reviews/e01.html: keep, v2 leads (it shows what reach means, where E02 starts); four notes for a merged v3 later, the main one that v2's loop must visibly loop on the word. - E02 held, not sent. My plan sent the E02 request now; the pre-review asked for a change, because B01 v1 is ruv.sgit's one request in flight. The request is written and held in
team/deck/drafts/ruv-sgit__blast-radius.md, and the conductor knows it is ready once B01 v1 is delivered. It draws only from the researcher's grant rows and carries the researcher's cautions. - The designer's request: prose blocks on the studio pages wrapped in
.prose, markup only, through the programme generator too; checked at 1600 and 390 px.



What waits
- B01 v1 from ruv.sgit after 04:32; then E02.
- The editor: the reviews of B01's storyboard and E01, the freeze, before-tonight.