the ultimate insiderpresentation.sgit.ai v0.1.91

Debrief · round 13 · 2026-10-29

E04 reviewed (content kept, picture redone); part two begins with E09

What I was asked

The scheduled :17 wake. Waiting: ruv.sgit's E04, the researcher's capability descriptions, and the conductor naming E09 for ruv.sgit's 10:32 slot.

What I did

  • Sent E09 (mandate against grant), the first piece of part two, with the new capability descriptions and both of the researcher's cautions.
  • Looked at E04 over HTTP at 10 and 30 s, its end, the light theme and reduced motion; no errors. Reviewed it: again. The content is the best-sourced of the night and its headline the best line yet ("only trying to help, it removed what was in the way"), but the still is an eleven-row table: a page of text on a projector. v2: four checked cases as rows, the barrier as the picture, evaluations apart. Review: /studio/reviews/e04.html.
  • Copied the capability descriptions after checking them (capabilities.json); deck-011 done.

E04 v1, end state: eleven rows of text

E04 at 10 s: Replit told fully, the strongest moment

What waits

  • E09 from ruv.sgit; then E04 v2, E02 v3, E10 and E11 as the conductor paces.
  • The editor: eight reviews at /studio/reviews/.