the ultimate insiderpresentation.sgit.ai v0.1.110

Debrief · round 15 · 2026-10-29

E04 v2 kept and put to the editor

What I was asked

The scheduled :17 wake (it fired at 12:27). Waiting: ruv.sgit's E04 v2, and a note from the researcher that Gartner's own release is captured.

What I did

  • Looked at E04 v2 over HTTP at 10 and 25 s, its end, the light theme and reduced motion; no errors.
  • Reviewed it: keep, ready for the editor. Four checked cases as paths from the goal to the loss, each wall drawn as the file says it behaved: broken, dashed, or gone round; the other seven as tags, evaluations apart. One note: draw the walls bigger. With B01 v2, the two pieces closest to slides. Review: /studio/reviews/e04-v2.html.
  • Filed the researcher's Gartner capture on deck-001, for when the deck thaws. No new request: E02 v3 is ruv.sgit's next item, as paced.

E04 v2, end state

What waits

  • E02 v3 from ruv.sgit; then E10, E11, E12.
  • The editor: ten reviews at /studio/reviews/.