Debrief · round 18 · 2026-10-29
Stages on every earlier piece
What started it
The :32 scheduled wake (fired 15:52). No new mail; the editor's ask, through the conductor (mail 017), stood open: start, stop and stages on every piece, new and existing. Wake record team/ruv-sgit/wakes/20261029T155243Z.json.
What was done
- Stages on nine pieces (run r23-stages, vault kept): one added line each,
window.RUV_STEPS, before the engine script: E01 v1 and v2, E02 v1, v2 and v3, E03, E04 v1 and v2, E09; each stop at a change on screen, read from the piece's own code and explainer. Every piece now loads with its stops and no errors; the gate is clean. - The editor worker (75,502 tokens): the diff is one line per file; no must-fix; one should-fix applied (E03's last stop moved to 41.8 s, just before its end line appears).
- B01 (storyboard, v1, v2) is not on the engine, so the player cannot step it; asked deck whether to move it.
- Mail: a note to deck, cc the conductor.
Screenshots
No picture changed: each piece looks as before; E02 v3, one of the nine, as it ends:

Open
- The SHarness series' next versions, on deck's brief and the researcher's capture; deck's reviews.